Every fall, Minnesota property owners face the same decision: whether to start the building now or wait until spring. The ground usually makes that call. Once frost sets in, digging post holes and pouring footings gets slower, harder, and more expensive. But a pole building has an advantage most construction doesn’t: once the foundation work is done before the freeze, the rest of the building can keep going all winter long. The key is working with an experienced, local pole building contractor who knows how to schedule around Minnesota’s frost line and keep a project moving when the temperature drops.

Pole building going up before a Minnesota winter


Getting post holes, footings, and piers in before the ground freezes keeps a Minnesota project on track, including:

  • Year-round construction — Framing, trusses, roofing, and siding can go up through winter
  • A finished building by spring — Instead of just breaking ground when the snow melts
  • No frozen-ground digging — Avoiding ground thaw equipment, delays, and added cost
  • Better scheduling — Ahead of the spring rush when crews and permits back up
  • Footings set right — Below the frost line in properly prepared, unfrozen soil

For Minnesota property owners, starting in the fall can be the difference between breaking ground in the spring and using a finished building in the spring.

Experienced Minnesota Pole Building Contractor

Winter construction in Minnesota isn’t about toughing it out. It’s about planning — knowing how deep to dig, when the window is closing, and which parts of the job can safely happen in the cold. An experienced pole building contractor brings:

  • Knowledge of Minnesota frost depths — 42 to 60 inches depending on where you’re building
  • Realistic fall scheduling — For design, permits, site prep, and footings before freeze-up
  • Site preparation experience — Grading, drainage, and access that hold up through winter
  • Engineered designs — Through an authorized Wick Buildings dealer
  • References from past pole building projects — That prove reliability

Post-frame construction is one of the few building methods that handles a Minnesota winter well. There are no poured foundation walls waiting to cure — once the posts are set, the structure can go up in cold weather without holding up the schedule. Wick Buildings has engineered structures for Upper Midwest snow loads and wind for more than 100 years. **Allan Dorney Construction** partners with Wick because the values line up — do it right the first time, stand behind the work, and follow through to completion. As an authorized Wick Buildings dealer, the team handles design, site planning, foundation work, and construction with one point of contact from start to finish.

Plan Now, Build Through Winter

The window for foundation work closes at a different time every year, depending on the weather, the soil, and how far north you’re building and it usually closes faster than people expect. Projects that start the design conversation in early fall leave time for engineering, permitting, and site prep before freeze-up. Concrete floors are typically scheduled for spring or poured once the building is enclosed and the ground can be protected from frost, so the slab never holds up the rest of the project.

Custom pole buildings from Allan Dorney Construction are engineered for Minnesota snow loads and built year-round by an experienced local contractor — reach out this fall to get your foundation in before the ground freezes.